PDA

View Full Version : FASVIG



  1. FASVIG = Future Airspace Strategy VFR Implementation Group
  2. FASVIG background information and links
  3. FASVIG acronyms
  4. ATA: 2 Optimise CTR/CTA Structures for VFR Traffic
  5. VEE: 1 NOTAM Compatibility with Graphical Display
  6. MAS: 5 Modernise Regulated Airspace
  7. MAS: 3 LAMP and NTCA
  8. ATA: 3 Remove Under Utilised Regulated Airspace
  9. VEE: 6 Infringement Risk Warning Tool
  10. VEE: 7 Modernise UK RTF Procedures
  11. VEE: 8 Standardise UK FIS
  12. ATA: 5 Release ATZs at Closed Airfields
  13. VEE: 9 Common UK TA
  14. MAS: 6 Incentivise the Release of Underused CAS
  15. ATA: 7 Change Class A Airspace For VFR Access
  16. MAS: 2 Terminal Airspace Structures Generally
  17. New FASVIG forum
  18. VEE: 4 ADSB(out) implementation
  19. ATA: 4 FUA Principles Extended to Access for VFR
  20. ATA: 1 Understand VFR Capacity of Terminal Airspace
  21. MAS: 7 CAP 725 Transparency
  22. MAS: 1 Critical areas for VFR recognised in airspace policy
  23. MAS: 4 Design Rules for Terminal Airspace
  24. ATA: 6 Minimise Temporary Airspace Reservations
  25. VEE: 2 NOTAM Relevant to Time
  26. VEE: 3 Temporary Reserved Airspace Depiction for VFR Airspace
  27. VEE: 5 Route & Activity Deconfliction Tools
  28. Uncertified GPS ADS-B out
  29. Airspace around Farnborough